City of Burbank Water and Power - (CA) (CA) Outage & Grid Reliability
City of Burbank Water and Power - (CA) (U.S. EIA Utility #2507, Municipal) serves 53,689 total customers across 1 county/counties in California (LDWP grid). In official 2025 U.S. EIA Form 861 filings, customers experienced an average of 174.4 outage minutes per year (2.9 hours, SAIDI with major events) across 0.81 interruptions/yr — earning an EP Utility Reliability Grade of A. Observed average residential rate: 21.5¢/kWh.
What City of Burbank Water and Power - (CA) Outage Data Means for Customers
Burbank Water and Power is a municipal utility inside the LDWP balancing authority, serving 53,689 customers in Los Angeles County: 46,719 residential, 6,639 commercial, and 331 industrial. The latest EIA Form 861 data shows SAIDI of 174.4 minutes per year with major events and SAIFI of 0.81 outages per year. That works out to a bit less than one interruption per customer in a typical year. EP grades this an A, since the threshold for above-average reliability is 260 minutes or less.
The number that matters most is the one without major events: 12.8 minutes per year. On an ordinary day, the lights stay on. Most of the lost time comes from rare, big events such as severe storms, heat waves, or wildfire-related shutoffs and damage. Plan for those, not for the everyday flicker. Residential power averages 21.5 cents per kWh, so running a generator or battery as your only source for long stretches is not cheap either.
Sizing Quiet Home Backup vs. Standby Power in CA
With reliability this good, most homes need a short-duration bridge, not a whole-house monster. Start by listing what actually hurts when it goes dark: refrigerator, internet router, a few lights, phone charging, a medical device, maybe a sump or garage door opener. Add up the running watts, then check the starting surge on anything with a motor. That list sizes your system, not the square footage of your house.
A battery system with an inverter is quiet, has no fumes, and can sit in a garage or utility closet. It suits the short interruptions Burbank customers usually see. If you want to run central air or electric cooking through a multi-day event, you need either a large battery bank or a standby generator, and the price rises quickly. Have a licensed electrician install a transfer switch or an interlock so you never backfeed the line, which is dangerous to utility crews. Check local permit and air-quality rules before buying a fuel-burning unit, and never run one indoors or in an attached garage. Test whatever you buy under load once a quarter. A system that has never been exercised is a guess.
What Local Shops, Clinics & Facilities on City of Burbank Water and Power - (CA) Lines Should Do
If you are one of the 6,639 commercial or 331 industrial accounts, do a load triage before you shop for equipment. Sort circuits into three groups: life safety and clinical, revenue-critical, and everything else. Back up the first group completely, the second as far as budget allows, and let the third go dark.
Clinics and care facilities should confirm which outlets and equipment sit on emergency circuits, and that their transfer arrangements and fuel plans match their licensing and code requirements. Shops with refrigeration, point-of-sale systems, and network gear can often get by with a small online UPS for the electronics and a modest generator inlet for the coolers. Where a diesel unit is on the table, check emissions and permitting rules, including U.S. EPA requirements for engines.
Whatever you run, keep a written start-up and shutdown procedure, test the transfer gear under real load on a schedule, and rotate or treat stored fuel. Ask the utility about its planned outage notices and reporting channels, and keep that number posted at the front desk. With a 12.8-minute ordinary year, your backup will mostly sit idle, so make it simple and dependable for the day it has to run.
1. Official U.S. EIA Form 861 Reliability & Customer Record
| EIA Form 861 Metric | Observed Utility Value | Reporting Basis |
|---|---|---|
| SAIDI (Total Outage Minutes / Year) | 174.4 min/yr (2.9 hrs) | All Events w/ Major Event Days (2025) |
| SAIFI (Average Outages / Year) | 0.81 interruptions/yr | IEEE / Utility Standard w/ MED |
| CAIDI (Avg Restoration Minutes / Outage) | 215 min/outage | Average Customer Outage Duration |
| SAIDI (Blue-Sky / Excluding Major Storms) | 12.8 min/yr | Without Major Event Days |
| Total Customers (Res / Com / Ind) | 53,689 (46,719 / 6,639 / 331) | 2025 EIA Form 861 |
| Observed Residential Electricity Rate | 21.5¢/kWh | 2025 EIA Revenues / MWh |
| Ownership & Balancing Authority | Municipal • LDWP | U.S. EIA Form 861 |
2. Counties Served by City of Burbank Water and Power - (CA) (1 Tracked in California)
Select your county below to view local FEMA disaster history, CMS 24/7 emergency hospitals, NOAA Weather Radio frequencies, and county Continuity Grades:
3. Frequently Asked Questions (City of Burbank Water and Power - (CA))
How reliable is City of Burbank Water and Power - (CA) compared to other US utilities?
Under 2025 U.S. EIA Form 861 reporting, City of Burbank Water and Power - (CA) logged 174.4 total outage minutes/year (SAIDI with Major Event Days) and 12.8 minutes/year excluding major storms (Above-Average Reliability (<=260 min/yr)).
What counties does City of Burbank Water and Power - (CA) serve in California?
U.S. EIA Form 861 Service Territory records map City of Burbank Water and Power - (CA) to Los Angeles County in California.
What backup battery or generator size is recommended for City of Burbank Water and Power - (CA) customers?
For outages lasting 4 to 24+ hours, homeowners should start with 7–14 kWh of quiet indoor LFP battery backup for refrigeration, Wi-Fi, and medical devices—or an 18–22 kW standby generator with a UL 1008 transfer switch for full HVAC/well loads.