LIVE US PULSE: Loading NOAA NWS Alerts, DOE ODIN Outages, USGS Quakes & Wildfires...
Live Situation Room →
Emergency Preparedness
U.S. EIA Form 861 Utility Profile • Utility #6455 • Investor Owned • FPC

Duke Energy Florida, LLC (FL) Outage & Grid Reliability

Duke Energy Florida, LLC (U.S. EIA Utility #6455, Investor Owned) serves 2,037,985 total customers across 32 county/counties in Florida (FPC grid). In official 2025 U.S. EIA Form 861 filings, customers experienced an average of 86.6 outage minutes per year (1.4 hours, SAIDI with major events) across 0.97 interruptions/yr — earning an EP Utility Reliability Grade of AAA. Observed average residential rate: 18.36¢/kWh.

EIA Outage Time (SAIDI)86.6 min/yr (1.4 hrs)
Reliability GradeGrade AAA
Customers Served2,037,985 Total
Avg Residential Rate18.36¢/kWh
Utility Reliability Summary (Duke Energy Florida, LLC): Duke Energy Florida, LLC (U.S. EIA Utility #6455, Investor Owned) serves 2,037,985 total customers across 32 county/counties in Florida (FPC grid). In official 2025 U.S. EIA Form 861 filings, customers experienced an average of 86.6 outage minutes per year (1.4 hours, SAIDI with major events) across 0.97 interruptions/yr — earning an EP Utility Reliability Grade of AAA. Observed average residential rate: 18.36¢/kWh.
Utility Reliability Field Brief • Duke Energy Florida, LLC (FL)

What Duke Energy Florida, LLC Outage Data Means for Customers

Duke Energy Florida is an investor-owned utility in the FPC balancing authority. It serves 2,037,985 customers: 1,819,962 residential, 216,448 commercial, and 1,575 industrial. Residential power averages 18.36 cents per kWh. The 2025 EIA Form 861 shows SAIDI of 86.6 minutes per year with major events and 82.0 without them, plus SAIFI of 0.97 outages per year. That earns an AAA grade, top-decile, at or under 90 minutes. Put plainly, the average customer sees roughly one interruption a year, lasting about an hour and a half. But that average is spread across 32 tracked counties, from Alachua, Citrus, and Columbia to Bay, Brevard, and Dixie. Your feeder, your tree canopy, and your distance from the substation decide what you actually get. An average also hides the storm that leaves one street dark for days while the next one stays lit.

Sizing Quiet Home Backup vs. Standby Power in FL

Start with a written list of what must keep running: refrigerator, router, lights, phone chargers, any medical device, maybe a well pump. Central air conditioning is the load that breaks budgets, so decide early whether it is on the list.

For the short outages the data describes, a battery and inverter system is usually the right tool. It is quiet, burns no fuel, and makes no exhaust. Size the inverter in kilowatts for what runs at the same moment, and the battery in kilowatt-hours for how many hours you need. Motors in compressors and pumps draw a surge on startup, so check that number, not just the nameplate running watts.

For multi-day hurricane outages, or whole-house loads including air conditioning, a permanently installed natural gas or propane standby generator with an automatic transfer switch is the better fit. It needs a permit, a licensed electrician, a fuel supply plan, and regular exercise runs. Many homeowners pair a small battery with a standby unit.

Never run a portable generator in a garage or near a window. Carbon monoxide kills people every storm season. Never backfeed a panel through a dryer outlet. That endangers line crews.

What Local Shops, Clinics & Facilities on Duke Energy Florida, LLC Lines Should Do

Begin with a load study. Identify the circuits that protect revenue or safety: refrigeration, point-of-sale, phones, data, egress lighting, and pumps. Wire those to a transfer switch and leave the rest off. Backing up everything is how budgets get blown.

Clinics should list what loses value without power, such as medication and vaccine refrigeration, powered patient equipment, and records access. Set a written threshold for when you close or redirect patients. Do not assume a generator makes you a designated emergency facility.

Municipal operators should treat lift stations, water pumps, traffic signals, and dispatch centers as first priority. Confirm fuel contracts, on-site storage limits, and refill access before a storm, not during one.

Everyone should test under real load monthly, log the results, and replace batteries and fuel on schedule. A generator that has never carried the building is just a lawn ornament. Also keep a record of what each outage costs you. With an average of 0.97 outages a year, that figure tells you how much backup is worth buying.

1. Official U.S. EIA Form 861 Reliability & Customer Record

EIA Form 861 MetricObserved Utility ValueReporting Basis
SAIDI (Total Outage Minutes / Year)86.6 min/yr (1.4 hrs)All Events w/ Major Event Days (2025)
SAIFI (Average Outages / Year)0.97 interruptions/yrIEEE / Utility Standard w/ MED
CAIDI (Avg Restoration Minutes / Outage)88.9 min/outageAverage Customer Outage Duration
SAIDI (Blue-Sky / Excluding Major Storms)82 min/yrWithout Major Event Days
Total Customers (Res / Com / Ind)2,037,985 (1,819,962 / 216,448 / 1,575)2025 EIA Form 861
Observed Residential Electricity Rate18.36¢/kWh2025 EIA Revenues / MWh
Ownership & Balancing AuthorityInvestor Owned • FPCU.S. EIA Form 861

2. Counties Served by Duke Energy Florida, LLC (32 Tracked in Florida)

Select your county below to view local FEMA disaster history, CMS 24/7 emergency hospitals, NOAA Weather Radio frequencies, and county Continuity Grades:

3. Frequently Asked Questions (Duke Energy Florida, LLC)

How reliable is Duke Energy Florida, LLC compared to other US utilities?

Under 2025 U.S. EIA Form 861 reporting, Duke Energy Florida, LLC logged 86.6 total outage minutes/year (SAIDI with Major Event Days) and 82 minutes/year excluding major storms (Top-Decile Grid Reliability (<=90 min/yr)).

What counties does Duke Energy Florida, LLC serve in Florida?

U.S. EIA Form 861 Service Territory records map Duke Energy Florida, LLC to Alachua County, Bay County, Brevard County, Citrus County, Columbia County, Dixie County, Flagler County, Franklin County and 24 additional counties in Florida.

What backup battery or generator size is recommended for Duke Energy Florida, LLC customers?

For outages lasting 4 to 24+ hours, homeowners should start with 7–14 kWh of quiet indoor LFP battery backup for refrigeration, Wi-Fi, and medical devices—or an 18–22 kW standby generator with a UL 1008 transfer switch for full HVAC/well loads.

Free backup power & water sizer (60 sec) Size Backup Power