San Diego Community Power (CA) Outage & Grid Reliability
San Diego Community Power (U.S. EIA Utility #64289, Community Choice Aggregator) serves 939,547 total customers across 1 county/counties in California (CISO grid). Official EIA Form 861 reliability SAIDI/SAIFI metrics are not separately filed for this utility tier. Observed average residential rate: 15.76¢/kWh.
What San Diego Community Power Outage Data Means for Customers
San Diego Community Power is a Community Choice Aggregator in the CISO balancing authority, serving 939,547 customers. Of those, 851,153 are residential, 85,373 are commercial, and 3,021 are industrial. The residential average is 15.76 cents per kWh.
Here is what the reliability data tells you: nothing. This filer did not report EIA Form 861 reliability metrics because it files the short form, so the grade is NR, meaning not reported. That is not a good or bad mark. It means there is no published outage frequency or duration figure to lean on.
So plan from your own history. Write down every outage you remember, how long it lasted, and what broke. Check your breaker panel, your meter location, and what sits on the circuit feeding your most critical gear. Your own record beats a number nobody filed.
Sizing Quiet Home Backup vs. Standby Power in CA
Start with a list, not a product. Write down what must stay on: refrigerator, a few lights, internet, phone charging, a medical device if you have one, and maybe a furnace blower or a well pump. For each, note running watts and starting watts. Motors pull far more for a moment when they kick on, and that surge is what trips undersized systems.
A battery with an inverter is quiet, has no exhaust, and can sit in a garage. It suits short outages and a tight essential-loads list. It runs out, though, and the size of the list decides how soon. Solar paired with the battery can extend that, but only if the system is wired to run while the grid is down. Many are not by default, so ask your installer directly.
A standby generator on natural gas or propane handles bigger loads and longer events. It needs a proper transfer switch, correct clearances, and a permit. Portable units must never run indoors or in a garage, because carbon monoxide kills quietly. Pick equipment that meets U.S. EPA and state emissions rules.
At 15.76 cents per kWh, do not expect a battery to pay for itself through bill savings alone. Buy backup for the outage you are trying to cover.
What Local Shops, Clinics & Facilities on San Diego Community Power Lines Should Do
Commercial and industrial accounts are a small share of the customer count but carry the payroll and the public services. Begin with a critical-load panel: the circuits you cannot lose, such as refrigeration, point-of-sale, network gear, alarm and access systems, emergency lighting, and any medication or sample storage.
Clinics and care facilities should confirm in writing which loads their backup actually carries. Generators that start but do not pick up the right panel are a common failure. Test under real load, not just a no-load run. Log it, check fuel quality and quantity, and replace batteries on the starter.
Shops with perishables should pair a small battery or UPS for the ride-through with a generator inlet for longer events. Municipal operators should map pump stations, traffic signals, communications sites, and shelters, then rank them. Not every site deserves a permanent generator, but each one deserves a plan, whether that is a fixed unit, a quick-connect inlet, or a rental agreement.
Because this is a CCA, ask who handles what. Outage response and wires work typically sit with the local delivery utility, while billing and power supply sit with the CCA. Keep both numbers posted next to the panel, and run a drill at least once a year.
1. Official U.S. EIA Form 861 Reliability & Customer Record
| EIA Form 861 Metric | Observed Utility Value | Reporting Basis |
|---|---|---|
| SAIDI (Total Outage Minutes / Year) | Not Reported | All Events w/ Major Event Days (EIA 861) |
| SAIFI (Average Outages / Year) | Not Reported | IEEE / Utility Standard w/ MED |
| CAIDI (Avg Restoration Minutes / Outage) | Not Reported | Average Customer Outage Duration |
| SAIDI (Blue-Sky / Excluding Major Storms) | Not Reported | Without Major Event Days |
| Total Customers (Res / Com / Ind) | 939,547 (851,153 / 85,373 / 3,021) | 2025 EIA Form 861 |
| Observed Residential Electricity Rate | 15.76¢/kWh | 2025 EIA Revenues / MWh |
| Ownership & Balancing Authority | Community Choice Aggregator • CISO | U.S. EIA Form 861 |
3. Frequently Asked Questions (San Diego Community Power)
How reliable is San Diego Community Power compared to other US utilities?
San Diego Community Power files under EIA Form 861 short-form/exempt reliability reporting, so standardized IEEE SAIDI/SAIFI outage minutes are not published by EIA. Customers should evaluate backup sizing using their parent county FEMA hazard history below.
What counties does San Diego Community Power serve in California?
San Diego Community Power operates within California (Community Choice Aggregator). Check your exact county dossier via the California State Command Hub.
What backup battery or generator size is recommended for San Diego Community Power customers?
For outages lasting 4 to 24+ hours, homeowners should start with 7–14 kWh of quiet indoor LFP battery backup for refrigeration, Wi-Fi, and medical devices—or an 18–22 kW standby generator with a UL 1008 transfer switch for full HVAC/well loads.