Wisconsin Electric Power Co (WI) Outage & Grid Reliability
Wisconsin Electric Power Co (U.S. EIA Utility #20847, Investor Owned) serves 1,179,163 total customers across 28 county/counties in Wisconsin (MISO grid). In official 2025 U.S. EIA Form 861 filings, customers experienced an average of 185 outage minutes per year (3.1 hours, SAIDI with major events) across 0.9 interruptions/yr — earning an EP Utility Reliability Grade of A. Observed average residential rate: 20.53¢/kWh.
What Wisconsin Electric Power Co Outage Data Means for Customers
Wisconsin Electric Power Co is an investor-owned utility in the MISO balancing authority. It serves 1,179,163 customers: 1,056,086 residential, 122,458 commercial, and 617 industrial. The 2025 EIA Form 861 data shows SAIDI of 185.0 minutes a year with major events and 93.0 without them, plus SAIFI of 0.9 outages a year. That earns an A grade, since above-average reliability means 260 minutes or less.
In plain terms, the average customer loses power less than once a year, and not for long. But averages hide the tail. The gap between 93.0 and 185.0 minutes is major events, meaning storms, ice, and wind, and that is where people get hurt. If you sit at the end of a long lateral or a tree-lined feeder in Columbia, Dodge, Brown, Dane, Calumet, or Florence County, your year can look nothing like the system average. Ask your neighbors what the last bad storm did, because the report will not tell you that.
Residential power averages 20.53 cents per kWh. Backup should cover the outages that matter, not become a second utility.
Sizing Quiet Home Backup vs. Standby Power in WI
Start with a list, not a product. Sump pump, furnace blower, refrigerator, a few lights, internet, phone charging, and any medical equipment make up your critical load. Everything else can wait.
Battery systems are quiet and need no fuel or exhaust, so they suit short outages and sensitive electronics. Their limit is stored energy. When it runs out, you wait for sun or the grid.
Standby generators on natural gas or propane carry heavier loads, such as well pumps, and run as long as the fuel does. They need a transfer switch, a permit, proper clearances, and regular exercise runs. If the generator is U.S. EPA-certified and installed to code, it is a sound long-duration answer.
Wisconsin winters set the stakes. A furnace that quits in January is the real emergency, so plan around heat first.
Given an A-grade system, most homes do fine with a modest battery or small standby unit sized to essentials. Go whole-house if you have a well, medical needs, or a home office you cannot lose.
Never run a portable generator in a garage or near a window. Carbon monoxide kills quietly. Never backfeed through a dryer outlet. Have a licensed electrician install a transfer switch or interlock.
What Local Shops, Clinics & Facilities on Wisconsin Electric Power Co Lines Should Do
Put a dollar figure on an hour of downtime, then protect the circuits that earn or save that money. For shops, that means registers, refrigeration, network gear, and egress lighting. A UPS handles the first few minutes and a generator handles the rest. Do not assume one covers the other's job.
Clinics should list what cannot warm up or shut off: medication and vaccine refrigeration, oxygen concentrators, records systems, and exam lighting. Confirm requirements with your local code authority and insurer, and test under real load, not just by idling the engine.
Municipal operators should rank water pumping, wastewater lift stations, dispatch, and warming centers first. Run annual load-bank tests, log fuel levels, and keep a fuel delivery contract that works when roads are bad. Check air permit rules for engines with your state regulator and U.S. EPA guidance.
Larger commercial and industrial accounts should ask the utility about feeder history and the restoration priority process. Fix the failures you find in testing now, not during the next ice storm.
1. Official U.S. EIA Form 861 Reliability & Customer Record
| EIA Form 861 Metric | Observed Utility Value | Reporting Basis |
|---|---|---|
| SAIDI (Total Outage Minutes / Year) | 185 min/yr (3.1 hrs) | All Events w/ Major Event Days (2025) |
| SAIFI (Average Outages / Year) | 0.9 interruptions/yr | IEEE / Utility Standard w/ MED |
| CAIDI (Avg Restoration Minutes / Outage) | 205.6 min/outage | Average Customer Outage Duration |
| SAIDI (Blue-Sky / Excluding Major Storms) | 93 min/yr | Without Major Event Days |
| Total Customers (Res / Com / Ind) | 1,179,163 (1,056,086 / 122,458 / 617) | 2025 EIA Form 861 |
| Observed Residential Electricity Rate | 20.53¢/kWh | 2025 EIA Revenues / MWh |
| Ownership & Balancing Authority | Investor Owned • MISO | U.S. EIA Form 861 |
2. Counties Served by Wisconsin Electric Power Co (28 Tracked in Wisconsin)
Select your county below to view local FEMA disaster history, CMS 24/7 emergency hospitals, NOAA Weather Radio frequencies, and county Continuity Grades:
3. Frequently Asked Questions (Wisconsin Electric Power Co)
How reliable is Wisconsin Electric Power Co compared to other US utilities?
Under 2025 U.S. EIA Form 861 reporting, Wisconsin Electric Power Co logged 185 total outage minutes/year (SAIDI with Major Event Days) and 93 minutes/year excluding major storms (Above-Average Reliability (<=260 min/yr)).
What counties does Wisconsin Electric Power Co serve in Wisconsin?
U.S. EIA Form 861 Service Territory records map Wisconsin Electric Power Co to Brown County, Calumet County, Columbia County, Dane County, Dodge County, Florence County, Fond du Lac County, Forest County and 20 additional counties in Wisconsin.
What backup battery or generator size is recommended for Wisconsin Electric Power Co customers?
For outages lasting 4 to 24+ hours, homeowners should start with 7–14 kWh of quiet indoor LFP battery backup for refrigeration, Wi-Fi, and medical devices—or an 18–22 kW standby generator with a UL 1008 transfer switch for full HVAC/well loads.