Customers served by Central Alabama Electric Coop (Cooperative, 48,071 meters across 10 Alabama county/counties) lost power an average of 7.8 hours per year (468.5 minutes across — outages/yr in 2025 federal EIA filings) — earning Reliability Grade BB. Average residential electricity rate: 17.21¢/kWh.

EIA Outage Time (SAIDI)468.5 min/yr (7.8 hrs)
Reliability GradeGrade BB
Customers Served48,071 Total
Avg Residential Rate17.21¢/kWh
Utility Reliability Summary (Central Alabama Electric Coop): Customers served by Central Alabama Electric Coop (Cooperative, 48,071 meters across 10 Alabama county/counties) lost power an average of 7.8 hours per year (468.5 minutes across — outages/yr in 2025 federal EIA filings) — earning Reliability Grade BB. Average residential electricity rate: 17.21¢/kWh.
Utility Reliability Field Brief • Central Alabama Electric Coop (AL)

What Central Alabama Electric Coop Outage Data Means for Customers

Central Alabama Electric Coop is a cooperative serving 48,071 customers: 45,580 residential, 2,487 commercial, and 4 industrial. It buys through the SOCO balancing authority. Residential customers pay an average of 17.21 cents per kWh.

The 2025 EIA Form 861 shows SAIDI of 468.5 minutes a year with major events included. That is about 7.8 hours without power for the average customer. Take out the major storm days and it drops to 188.8 minutes, a little over three hours. SAIFI came back as None in the data, so I won't tell you how many times your lights blink in a year.

The gap between those two numbers matters. On an ordinary year you deal with short, scattered interruptions. When a big storm rolls through, a handful of days account for most of your annual downtime. EP grades this territory BB, which means elevated multi-hour outage territory, roughly 7 to 12 hours a year. Plan for one long event, not constant small ones. The footprint includes Autauga, Bibb, Chilton, Coosa, Dallas, and Elmore counties, and rural line miles through timber mean tree contact is the usual culprit.

Sizing Quiet Home Backup vs. Standby Power in AL

Start with what you must keep running, not what you'd like to run. For most households that means the refrigerator, a few lights, phone chargers, internet, a fan or furnace blower, and any medical equipment. Write down the running watts and the starting surge for anything with a motor, such as a well pump, a freezer, or an air conditioner compressor.

A battery system with an inverter is quiet and switches over fast. It is a good fit for a few hours of essential loads, which matches the typical multi-hour outage this grade describes. It will not carry central air conditioning through a multi-day storm unless it is sized well beyond the basics. A permanently installed standby generator on natural gas or propane handles whole-house loads and long outages, but it needs a proper transfer switch, correct clearances, and fuel you can count on. Portable generators belong outdoors, well away from windows, never in a garage. Have a licensed electrician install an interlock or transfer switch so you never backfeed the line and endanger a lineman.

Running a generator on fuel costs money too, so compare it against the 17.21 cents per kWh you pay the co-op, and remember you're buying reliability, not savings. Look for equipment that meets current U.S. EPA emissions requirements.

What Local Shops, Clinics & Facilities on Central Alabama Electric Coop Lines Should Do

With 2,487 commercial accounts on the system, plenty of you share the same exposure. Begin by sorting your loads into three groups: life-safety and critical, revenue-protecting, and everything else. Back up the first group without exception, the second as budget allows, and let the third go dark.

Shops should protect point-of-sale systems, refrigeration, security, and network gear with a battery backup, and decide whether a generator inlet makes sense so you can connect a rental unit fast. Clinics and care facilities should confirm with their own regulators and engineers what backup their services require, then test it under real load, not just run it idle. Municipal operators should put water, wastewater pumping, communications, and dispatch on dedicated standby power with a fuel plan that lasts beyond the first day.

Whatever you install, exercise it monthly, keep fuel fresh, log run times, and replace batteries on schedule. Call the co-op about your service and ask which feeder you're on. Backup power that hasn't been tested is only a guess.

1. Official U.S. EIA Form 861 Reliability & Customer Record

EIA Form 861 MetricObserved Utility ValueReporting Basis
SAIDI (Total Outage Minutes / Year)468.5 min/yr (7.8 hrs)All Events w/ Major Event Days (2025)
SAIFI (Average Outages / Year)Not ReportedIEEE / Utility Standard w/ MED
CAIDI (Avg Restoration Minutes / Outage)Not ReportedAverage Customer Outage Duration
SAIDI (Blue-Sky / Excluding Major Storms)188.8 min/yrWithout Major Event Days
Total Customers (Res / Com / Ind)48,071 (45,580 / 2,487 / 4)2025 EIA Form 861
Observed Residential Electricity Rate17.21¢/kWh2025 EIA Revenues / MWh
Ownership & Balancing AuthorityCooperative • SOCOU.S. EIA Form 861

2. Counties Served by Central Alabama Electric Coop (10 Tracked in Alabama)

Select your county below to view local FEMA disaster history, CMS 24/7 emergency hospitals, NOAA Weather Radio frequencies, and county Continuity Grades:

3. Frequently Asked Questions (Central Alabama Electric Coop)

How reliable is Central Alabama Electric Coop compared to other US utilities?

Under 2025 U.S. EIA Form 861 reporting, Central Alabama Electric Coop logged 468.5 total outage minutes/year (SAIDI with Major Event Days) and 188.8 minutes/year excluding major storms (Elevated Multi-Hour Outage Territory (7–12 hrs/yr)).

What counties does Central Alabama Electric Coop serve in Alabama?

U.S. EIA Form 861 Service Territory records map Central Alabama Electric Coop to Autauga County, Bibb County, Chilton County, Coosa County, Dallas County, Elmore County, Lowndes County, Perry County and 2 additional counties in Alabama.

What backup battery or generator size is recommended for Central Alabama Electric Coop customers?

For outages lasting multi-day stretches during storms, homeowners should start with 7–14 kWh of quiet indoor LFP battery backup for refrigeration, Wi-Fi, and medical devices—or an 18–22 kW standby generator with a UL 1008 transfer switch for full HVAC/well loads.

P.S. — The Short Answer (10-Second Takeaway):
  • Check your local risk first: Open Right-Now Crisis Mode or inspect your county grade to lock in local NOAA radio MHz, pipe-freeze floors, and 24/7 hospitals.
  • Fix your weakest link before a storm: Run our free 60-Second Home Blackout Stress Test or 13 sizing calculators before buying gear.
  • Keep an offline paper copy: Click Print above to put a 1-page Lifeline Card on your fridge or facility wall before cell towers go dark.
100% Money-Back & Zero-Obligation Guarantee

Our risk-free engineering & satisfaction guarantee

Every interactive sizing calculator, county/ZIP hazard dossier, and local contractor quote match is 100% free with zero obligation, and every paid Continuity Binder or Institutional Kit is backed by a 30-day 100% unconditional money-back guarantee.

Free backup power & water sizer (60 sec) Size Backup Power