Cherryland Electric Coop Inc (MI) Outage & Grid Reliability
Customers served by Cherryland Electric Coop Inc (Cooperative, 39,114 meters across 6 Michigan county/counties) lost power an average of 1.7 hours per year (99.6 minutes across 0.87 outages/yr in 2025 federal EIA filings) — earning Reliability Grade AA. Average residential electricity rate: 17.29¢/kWh.
What Cherryland Electric Coop Inc Outage Data Means for Customers
Cherryland Electric Coop Inc is a cooperative in the MISO balancing authority. It serves 39,114 customers across Benzie, Grand Traverse, Kalkaska, Leelanau, Manistee and Wexford counties: 35,548 residential, 3,181 commercial and 385 industrial. EIA Form 861 shows SAIDI of 99.6 minutes a year with major events and 67.9 without them, plus SAIFI of 0.87 outages a year. That earns an AA grade, which covers anything at or under 160 minutes. In plain terms, the average member loses power less than once a year, for under two hours total. The roughly 32-minute gap between the two SAIDI figures is storm weight. Averages hide the tail, though. If you sit at the end of a long rural tap through wooded country, your year may look nothing like the average. Residential power averages 17.29 cents per kWh, so judge backup against outage pain, not bill savings.
Sizing Quiet Home Backup vs. Standby Power in MI
With reliability this good, most homes need a short-duration answer, not a whole-house monster. Start by listing what actually hurts when it goes dark: furnace blower, well pump, sump pump, refrigerator, a few lights, router, medical gear. Add up the running loads, then leave room for motor startup surge, which is what trips undersized units. A battery with an inverter covers that list quietly, with no fuel, no exhaust and no angry neighbors. Choose a battery if your outages are short and you want automatic switchover. Choose a permanent standby generator on natural gas or propane if you face multi-day northern Michigan ice storms, run electric heat, or depend on a well and septic pump. Portable generators belong outdoors, well away from windows, connected only through a proper inlet and interlock, never a backfed dryer cord. Carbon monoxide kills people every winter. Have a licensed electrician pull the permit and install the transfer switch.
What Local Shops, Clinics & Facilities on Cherryland Electric Coop Inc Lines Should Do
The 3,566 commercial and industrial accounts should treat the average as a starting point. Walk the building and rank loads: life safety, refrigeration, data and point-of-sale, then comfort. Clinics and care facilities should keep medical refrigeration on dedicated, generator-backed circuits and test them under real load, not idling. Shops with three-phase equipment should add phase-loss protection, because a single-phase fault upstream can cook motors. Put a small UPS on servers and registers so a blip does not corrupt data. Municipal operators running water, sewer lift stations and dispatch should hold fuel contracts, exercise generators monthly and keep a written transfer procedure where the night shift can find it. Ask Cherryland about your feeder's outage history before buying equipment, since that tells you what your tap actually sees. Then budget for annual maintenance. A generator that has never carried a load is a hope, not a plan.
1. Official U.S. EIA Form 861 Reliability & Customer Record
| EIA Form 861 Metric | Observed Utility Value | Reporting Basis |
|---|---|---|
| SAIDI (Total Outage Minutes / Year) | 99.6 min/yr (1.7 hrs) | All Events w/ Major Event Days (2025) |
| SAIFI (Average Outages / Year) | 0.87 interruptions/yr | IEEE / Utility Standard w/ MED |
| CAIDI (Avg Restoration Minutes / Outage) | 114.3 min/outage | Average Customer Outage Duration |
| SAIDI (Blue-Sky / Excluding Major Storms) | 67.9 min/yr | Without Major Event Days |
| Total Customers (Res / Com / Ind) | 39,114 (35,548 / 3,181 / 385) | 2025 EIA Form 861 |
| Observed Residential Electricity Rate | 17.29¢/kWh | 2025 EIA Revenues / MWh |
| Ownership & Balancing Authority | Cooperative • MISO | U.S. EIA Form 861 |
2. Counties Served by Cherryland Electric Coop Inc (6 Tracked in Michigan)
Select your county below to view local FEMA disaster history, CMS 24/7 emergency hospitals, NOAA Weather Radio frequencies, and county Continuity Grades:
3. Frequently Asked Questions (Cherryland Electric Coop Inc)
How reliable is Cherryland Electric Coop Inc compared to other US utilities?
Under 2025 U.S. EIA Form 861 reporting, Cherryland Electric Coop Inc logged 99.6 total outage minutes/year (SAIDI with Major Event Days) and 67.9 minutes/year excluding major storms (High Grid Reliability (<=160 min/yr)).
What counties does Cherryland Electric Coop Inc serve in Michigan?
U.S. EIA Form 861 Service Territory records map Cherryland Electric Coop Inc to Benzie County, Grand Traverse County, Kalkaska County, Leelanau County, Manistee County, Wexford County in Michigan.
What backup battery or generator size is recommended for Cherryland Electric Coop Inc customers?
For outages lasting 4 to 24+ hours, homeowners should start with 7–14 kWh of quiet indoor LFP battery backup for refrigeration, Wi-Fi, and medical devices—or an 18–22 kW standby generator with a UL 1008 transfer switch for full HVAC/well loads.
- Check your local risk first: Open Right-Now Crisis Mode or inspect your county grade to lock in local NOAA radio MHz, pipe-freeze floors, and 24/7 hospitals.
- Fix your weakest link before a storm: Run our free 60-Second Home Blackout Stress Test or 13 sizing calculators before buying gear.
- Keep an offline paper copy: Click Print above to put a 1-page Lifeline Card on your fridge or facility wall before cell towers go dark.
Our risk-free engineering & satisfaction guarantee
Every interactive sizing calculator, county/ZIP hazard dossier, and local contractor quote match is 100% free with zero obligation, and every paid Continuity Binder or Institutional Kit is backed by a 30-day 100% unconditional money-back guarantee.