City of Murray - (UT) (UT) Outage & Grid Reliability
Customers served by City of Murray - (UT) (Municipal, 20,962 meters across 1 Utah county/counties) lost power an average of 0.9 hours per year (54 minutes across 0.9 outages/yr in 2025 federal EIA filings) — earning Reliability Grade AAA. Average residential electricity rate: 12.45¢/kWh.
What City of Murray - (UT) Outage Data Means for Customers
Murray runs a municipal system serving 20,962 customers: 17,724 residential, 3,236 commercial, and 2 industrial. It sits in Salt Lake County within the PACE balancing authority. The 2025 EIA Form 861 filing shows a SAIDI of 54.0 minutes per year with major events included, and a SAIFI of 0.9 outages per year. The without-major-events figure was not reported, so I won't guess at it. That puts Murray in our AAA tier, which means top-decile reliability at 90 minutes a year or less.
In plain terms, the average customer sees less than one interruption a year, and those interruptions add up to under an hour. That works out to roughly an hour per event, though averages hide the bad days. A single windstorm or a failed switch can leave one street dark far longer than the number suggests. Your residential rate of 12.45 cents per kWh is also a reminder that grid power is the cheap part of this arrangement. Backup power is insurance, and it costs more per kWh than the grid.
Sizing Quiet Home Backup vs. Standby Power in UT
With this record, most homes do not need a whole-house generator running everything. Start with what actually hurts when it goes dark: the refrigerator, a few lights, internet, phone charging, and any medical equipment. Add up the running watts for those loads, then check the startup surge on motors like sump pumps and furnace blowers. Surge is where undersized units trip.
A battery system or a portable inverter unit covers that short list quietly, with no fuel to store and no fumes. It suits the short outages Murray customers typically see. A permanently installed standby generator makes sense if someone in the house depends on powered medical gear, if you run a home business, or if you have a well or sump you can't lose. Whatever you buy, put in a proper transfer switch or interlock installed by a licensed electrician. Never backfeed through a dryer outlet. That endangers line crews and can kill someone working on a repair.
Never run a generator in a garage or near a window, even with the door open. Test whatever you own under real load twice a year.
What Local Shops, Clinics & Facilities on City of Murray - (UT) Lines Should Do
With 3,236 commercial accounts on the system, most outages will hit a business without warning, so plan for the first minute and the first hour separately. For the first minute, put a UPS on point-of-sale systems, servers, network gear, and anything that corrupts data when it drops. For the first hour, decide what must keep running and what can wait. Circuits for refrigeration, security, egress lighting, and communications come first. Cosmetic loads and big HVAC can wait.
Clinics and care-related facilities should walk their equipment list and separate life-safety and medication-storage needs from convenience. Then size standby power to the critical list, not the whole panel. Have an electrician confirm transfer switch capacity and fuel runtime, and write down who starts the unit and who checks it. Exercise it under load on a schedule, because the usual failure is a generator that starts fine and then can't carry the load.
Municipal operators should keep the same discipline for pump stations, traffic signals, and communications sites. Track which sites have backup, how long it lasts, and when it was last tested. A good reliability grade doesn't help the one site that has no plan.
1. Official U.S. EIA Form 861 Reliability & Customer Record
| EIA Form 861 Metric | Observed Utility Value | Reporting Basis |
|---|---|---|
| SAIDI (Total Outage Minutes / Year) | 54 min/yr (0.9 hrs) | All Events w/ Major Event Days (2025) |
| SAIFI (Average Outages / Year) | 0.9 interruptions/yr | IEEE / Utility Standard w/ MED |
| CAIDI (Avg Restoration Minutes / Outage) | 60 min/outage | Average Customer Outage Duration |
| SAIDI (Blue-Sky / Excluding Major Storms) | Not Reported | Without Major Event Days |
| Total Customers (Res / Com / Ind) | 20,962 (17,724 / 3,236 / 2) | 2025 EIA Form 861 |
| Observed Residential Electricity Rate | 12.45¢/kWh | 2025 EIA Revenues / MWh |
| Ownership & Balancing Authority | Municipal • PACE | U.S. EIA Form 861 |
2. Counties Served by City of Murray - (UT) (1 Tracked in Utah)
Select your county below to view local FEMA disaster history, CMS 24/7 emergency hospitals, NOAA Weather Radio frequencies, and county Continuity Grades:
3. Frequently Asked Questions (City of Murray - (UT))
How reliable is City of Murray - (UT) compared to other US utilities?
Under 2025 U.S. EIA Form 861 reporting, City of Murray - (UT) logged 54 total outage minutes/year (SAIDI with Major Event Days) and — minutes/year excluding major storms (Top-Decile Grid Reliability (<=90 min/yr)).
What counties does City of Murray - (UT) serve in Utah?
U.S. EIA Form 861 Service Territory records map City of Murray - (UT) to Salt Lake County in Utah.
What backup battery or generator size is recommended for City of Murray - (UT) customers?
For outages lasting 4 to 24+ hours, homeowners should start with 7–14 kWh of quiet indoor LFP battery backup for refrigeration, Wi-Fi, and medical devices—or an 18–22 kW standby generator with a UL 1008 transfer switch for full HVAC/well loads.
- Check your local risk first: Open Right-Now Crisis Mode or inspect your county grade to lock in local NOAA radio MHz, pipe-freeze floors, and 24/7 hospitals.
- Fix your weakest link before a storm: Run our free 60-Second Home Blackout Stress Test or 13 sizing calculators before buying gear.
- Keep an offline paper copy: Click Print above to put a 1-page Lifeline Card on your fridge or facility wall before cell towers go dark.
Our risk-free engineering & satisfaction guarantee
Every interactive sizing calculator, county/ZIP hazard dossier, and local contractor quote match is 100% free with zero obligation, and every paid Continuity Binder or Institutional Kit is backed by a 30-day 100% unconditional money-back guarantee.