PUD No 1 of Benton County (WA) Outage & Grid Reliability
Customers served by PUD No 1 of Benton County (Political Subdivision, 58,679 meters across 1 Washington county/counties) lost power an average of 0.6 hours per year (36.1 minutes across 0.28 outages/yr in 2025 federal EIA filings) — earning Reliability Grade AAA. Average residential electricity rate: 9.13¢/kWh.
What PUD No 1 of Benton County Outage Data Means for Customers
PUD No 1 of Benton County is a political subdivision serving 58,679 customers in Benton County: 50,835 residential, 6,865 commercial, and 979 industrial. It sits in the BPAT balancing authority. The 2025 EIA Form 861 shows SAIDI at 36.1 minutes a year and SAIFI at 0.28 outages a year. The figure is the same with and without major events, so no storm-day adjustment is hiding anything. That earns an AAA grade, well inside the 90-minute top-decile line.
Divide those two numbers and the average interruption runs a bit over two hours. At 0.28 a year, the typical customer sees one roughly every three and a half years. Averages are not promises, though. A customer at the end of a long rural tap can have a very different experience than someone on a downtown feeder. Your own outage history matters more than the utility-wide number.
Sizing Quiet Home Backup vs. Standby Power in WA
With a two-hour average outage, most homes do not need a whole-house generator. They need a short list of things kept running: refrigerator, freezer, internet router, lights, phone charging, a gas furnace blower, and a sump pump if you have one. A battery system or a modest inverter unit handles that quietly and with no fuel to store.
Add up the running watts of those items, then check the starting surge on motors like the fridge compressor and the pump. Size the inverter for the surge and the battery for the hours you care about. Have an electrician install a transfer switch or a critical-loads subpanel. Never backfeed through a dryer outlet.
Standby generators make sense for well pumps, medical equipment, or home offices that cannot drop. At 9.13 cents per kWh, grid power is cheap, so backup is insurance and never a savings plan. Fuel costs more per kWh than the utility does. If you buy a generator, check that it meets current U.S. EPA emissions requirements, keep it away from windows, and install a carbon monoxide alarm. Run it under load for a short test every month.
What Local Shops, Clinics & Facilities on PUD No 1 of Benton County Lines Should Do
Start by pricing an outage, not guessing at it. Add up what an idle hour costs in lost sales, spoiled stock, and paid staff. Compare that with the installed cost of backup. For many small shops, a UPS on registers, network gear, and security systems, plus a few emergency lights, is the whole answer.
Clinics and care facilities should separate life-safety and critical loads from convenience loads, and test the transfer equipment under real load on a schedule. Log each test. A generator that starts but fails to transfer is the usual failure I see. Keep fuel fresh and know how long your tank runs at actual load.
Municipal operators should treat pump stations, lift stations, traffic signals, and communications sites as the priority list. Confirm each has a connection point for a portable generator, with the right plug and a documented procedure. Know which feeder serves each site and ask the PUD for outage history on those circuits.
With 979 industrial customers, process loads deserve their own review. Ride-through for short blips can matter more than long-run generation. Call the PUD before sizing anything large, because interconnection and switching rules apply.
1. Official U.S. EIA Form 861 Reliability & Customer Record
| EIA Form 861 Metric | Observed Utility Value | Reporting Basis |
|---|---|---|
| SAIDI (Total Outage Minutes / Year) | 36.1 min/yr (0.6 hrs) | All Events w/ Major Event Days (2025) |
| SAIFI (Average Outages / Year) | 0.28 interruptions/yr | IEEE / Utility Standard w/ MED |
| CAIDI (Avg Restoration Minutes / Outage) | 128.9 min/outage | Average Customer Outage Duration |
| SAIDI (Blue-Sky / Excluding Major Storms) | 36.1 min/yr | Without Major Event Days |
| Total Customers (Res / Com / Ind) | 58,679 (50,835 / 6,865 / 979) | 2025 EIA Form 861 |
| Observed Residential Electricity Rate | 9.13¢/kWh | 2025 EIA Revenues / MWh |
| Ownership & Balancing Authority | Political Subdivision • BPAT | U.S. EIA Form 861 |
2. Counties Served by PUD No 1 of Benton County (1 Tracked in Washington)
Select your county below to view local FEMA disaster history, CMS 24/7 emergency hospitals, NOAA Weather Radio frequencies, and county Continuity Grades:
3. Frequently Asked Questions (PUD No 1 of Benton County)
How reliable is PUD No 1 of Benton County compared to other US utilities?
Under 2025 U.S. EIA Form 861 reporting, PUD No 1 of Benton County logged 36.1 total outage minutes/year (SAIDI with Major Event Days) and 36.1 minutes/year excluding major storms (Top-Decile Grid Reliability (<=90 min/yr)).
What counties does PUD No 1 of Benton County serve in Washington?
U.S. EIA Form 861 Service Territory records map PUD No 1 of Benton County to Benton County in Washington.
What backup battery or generator size is recommended for PUD No 1 of Benton County customers?
For outages lasting 4 to 24+ hours, homeowners should start with 7–14 kWh of quiet indoor LFP battery backup for refrigeration, Wi-Fi, and medical devices—or an 18–22 kW standby generator with a UL 1008 transfer switch for full HVAC/well loads.
- Check your local risk first: Open Right-Now Crisis Mode or inspect your county grade to lock in local NOAA radio MHz, pipe-freeze floors, and 24/7 hospitals.
- Fix your weakest link before a storm: Run our free 60-Second Home Blackout Stress Test or 13 sizing calculators before buying gear.
- Keep an offline paper copy: Click Print above to put a 1-page Lifeline Card on your fridge or facility wall before cell towers go dark.