Customers served by Rockland Electric Co (Investor Owned, 76,407 meters across 3 New Jersey county/counties) lost power an average of 2.4 hours per year (144.1 minutes across 1.3 outages/yr in 2025 federal EIA filings) — earning Reliability Grade AA. Average residential electricity rate: 22.57¢/kWh.

EIA Outage Time (SAIDI)144.1 min/yr (2.4 hrs)
Reliability GradeGrade AA
Customers Served76,407 Total
Avg Residential Rate22.57¢/kWh
Utility Reliability Summary (Rockland Electric Co): Customers served by Rockland Electric Co (Investor Owned, 76,407 meters across 3 New Jersey county/counties) lost power an average of 2.4 hours per year (144.1 minutes across 1.3 outages/yr in 2025 federal EIA filings) — earning Reliability Grade AA. Average residential electricity rate: 22.57¢/kWh.
Utility Reliability Field Brief • Rockland Electric Co (NJ)

What Rockland Electric Co Outage Data Means for Customers

Rockland Electric Co is an investor-owned utility in the PJM balancing authority. It serves 76,407 customers across Bergen, Passaic and Sussex counties: 66,678 residential, 9,708 commercial and 21 industrial. The 2025 EIA Form 861 shows SAIDI of 144.1 minutes per year with major events and 105.5 without them. SAIFI is 1.3 outages per year. That earns an AA grade from EP Utility, the high-reliability band at 160 minutes or less.

In plain English, the average customer loses power a little more than once a year, for roughly two and a half hours total. Divide 144.1 by 1.3 and a typical interruption runs near 111 minutes. The 38.6-minute gap between the two SAIDI figures is storm time, and averages hide how unevenly it lands. A house at the end of a long wooded overhead line will have a different year than a building on a short, well-protected circuit. Your feeder matters more than the utility-wide number, so keep a simple log of your own outage dates and durations.

Sizing Quiet Home Backup vs. Standby Power in NJ

Start with what must stay on: refrigerator, boiler or furnace blower, sump pump, well pump if you have one, a few lights, the router, phone charging and any medical equipment. Add up running watts, then check the starting surge on every motor. Most homes do better with a critical-loads subpanel than with whole-house backup.

Battery systems are quiet, fume-free and well matched to the typical outage length in these numbers. Their limit is stored energy, not power, so a multi-day storm will drain them unless solar can recharge them. A permanently installed natural gas or propane standby generator with an automatic transfer switch covers long events. It needs a permit, correct clearances from windows and meters, and yearly service. Portable units are fine only with a proper inlet and interlock. Never backfeed through a dryer outlet, and keep any engine well outside, away from openings, because carbon monoxide kills quietly.

At 22.57 cents per kWh residential, backup power will not save you money. You are buying continuity. For many households a small battery for the short outages and a generator for the rare long one is the sensible pairing.

What Local Shops, Clinics & Facilities on Rockland Electric Co Lines Should Do

With 9,708 commercial customers on the system, most outages are short, and that shapes the plan. Put a UPS on point-of-sale, servers, phones and network gear so a brief interruption never corrupts data or drops a sale. Then decide what a two-hour outage actually costs you in spoiled stock, lost sales or idle staff. That figure tells you whether standby generation pays for itself.

Clinics and care facilities should list every load that cannot drop: vaccine and medication refrigeration, oxygen concentrators, records systems and egress lighting. Put those on dedicated emergency circuits, test the transfer switch under real load monthly, and keep a written fuel and refueling plan.

Municipal operators should rank pump stations, traffic signals, communications and shelters by consequence of failure. Exercise generators on a schedule, confirm fuel supply and emissions permits with the state and U.S. EPA rules in mind, and keep contact numbers for the utility's emergency desk current. The 21 industrial accounts should talk with the utility about voltage sags, since a blink can hurt a process even when the minutes look good.

Whatever your size, test the backup before the storm does.

1. Official U.S. EIA Form 861 Reliability & Customer Record

EIA Form 861 MetricObserved Utility ValueReporting Basis
SAIDI (Total Outage Minutes / Year)144.1 min/yr (2.4 hrs)All Events w/ Major Event Days (2025)
SAIFI (Average Outages / Year)1.3 interruptions/yrIEEE / Utility Standard w/ MED
CAIDI (Avg Restoration Minutes / Outage)111.1 min/outageAverage Customer Outage Duration
SAIDI (Blue-Sky / Excluding Major Storms)105.5 min/yrWithout Major Event Days
Total Customers (Res / Com / Ind)76,407 (66,678 / 9,708 / 21)2025 EIA Form 861
Observed Residential Electricity Rate22.57¢/kWh2025 EIA Revenues / MWh
Ownership & Balancing AuthorityInvestor Owned • PJMU.S. EIA Form 861

2. Counties Served by Rockland Electric Co (3 Tracked in New Jersey)

Select your county below to view local FEMA disaster history, CMS 24/7 emergency hospitals, NOAA Weather Radio frequencies, and county Continuity Grades:

3. Frequently Asked Questions (Rockland Electric Co)

How reliable is Rockland Electric Co compared to other US utilities?

Under 2025 U.S. EIA Form 861 reporting, Rockland Electric Co logged 144.1 total outage minutes/year (SAIDI with Major Event Days) and 105.5 minutes/year excluding major storms (High Grid Reliability (<=160 min/yr)).

What counties does Rockland Electric Co serve in New Jersey?

U.S. EIA Form 861 Service Territory records map Rockland Electric Co to Bergen County, Passaic County, Sussex County in New Jersey.

What backup battery or generator size is recommended for Rockland Electric Co customers?

For outages lasting 4 to 24+ hours, homeowners should start with 7–14 kWh of quiet indoor LFP battery backup for refrigeration, Wi-Fi, and medical devices—or an 18–22 kW standby generator with a UL 1008 transfer switch for full HVAC/well loads.

P.S. — The Short Answer (10-Second Takeaway):
  • Check your local risk first: Open Right-Now Crisis Mode or inspect your county grade to lock in local NOAA radio MHz, pipe-freeze floors, and 24/7 hospitals.
  • Fix your weakest link before a storm: Run our free 60-Second Home Blackout Stress Test or 13 sizing calculators before buying gear.
  • Keep an offline paper copy: Click Print above to put a 1-page Lifeline Card on your fridge or facility wall before cell towers go dark.
100% Money-Back & Zero-Obligation Guarantee

Our risk-free engineering & satisfaction guarantee

Every interactive sizing calculator, county/ZIP hazard dossier, and local contractor quote match is 100% free with zero obligation, and every paid Continuity Binder or Institutional Kit is backed by a 30-day 100% unconditional money-back guarantee.

Free backup power & water sizer (60 sec) Size Backup Power